At 258 MWp, the Taygete II Energy Project will be one of the larger solar projects to be built in Texas.
Solar energy from the Taygete II facility will be sold under a multi-year fixed priced power purchase agreement, which will bring the total developed by 7X in ERCOT to over 1,400 MWp.
Taygete II
Pecos County, TX on ~1600 acres
258 MWp
Approximately 644,000
7X Energy, the originating and sole developer, is currently managing construction and owns 100% of the equity in the project
Confidential
Multi-year
Operational (COD) Q3 2021
Taygete II will produce over ~595,680 MWh of renewable energy in its first year of operation. This equates1 to:
1 https://www.epa.gov/energy/greenhouse-gas-equivalencies-calculator (2019 eGrid ERCOT CO2 lbs/MWh emissions factor)